Brief: Discover the 3000tpd cement plant production line, a comprehensive limestone cement manufacturing plant using the wet process clinker grinding unit. This video showcases the entire production process from raw material handling to final cement packing.
Related Product Features:
Limestone crushing and transportation system ensures efficient material handling.
Pre-blending stockpile with cantilever stacking belt conveyor for consistent raw material quality.
Raw material proportioning with frequency control weighing belts for precise mix.
Vertical raw mill for efficient grinding and waste gas treatment at kiln inlet.
5-stage cyclone pre-heater and KSF calciner for optimal pre-calcining.
Rotary kiln with grate cooler for high-temperature clinker cooling.
Cement grinding system with two sets of circulating systems for high efficiency.
Comprehensive packing system with rotary packer and belt conveyor for easy loading.
FAQ:
How long does it take to deliver the complete cement production line?
The delivery time is 9 months after the advanced payment for the first lot and 12 months after the advanced payment for the second lot.
What payment methods are accepted for ordering the cement plant?
We accept T/T (Telegraphic Transfer) and L/C (Letter of Credit) as payment methods.
What types of cement can be produced with this plant?
The plant can produce OPC (Ordinary Portland Cement), PPC (Portland Pozzolana Cement), PFC (Portland Fly Ash Cement), and PSC (Portland Slag Cement).